Yume Noto V1 Portrait

Get 50% off digital planners & notebooks with code 50OFFWEB at checkout on NozomuNoto.com.

YUME NOTO 夢ノートV1 PORTRAITDIGITAL NOTEBOOK

One notebook for the different roles in your life.

Garden Edition · Grid preview

Beginner-friendly, with realistic paper texture and minimalist Japanese design. Make the sections your own.

  • 40 subjects & 12 side tabs
  • Fully hyperlinked indexes & templates
  • 107 pages per PDF · cover included
  • Grid, lines, dotted, blank & Cornell
  • Duplicate pages whenever you need more space

Digital PDF download for tablets and computers. Annotation app required. No physical item; not for phones or printing.

5 PDFs + tutorials + bonus covers & stickers

107
Pages per PDF
40
Subjects
12
Side tabs
49
Template pages
5
Paper formats

SIMPLE ENOUGH TO START. FLEXIBLE ENOUGH TO GROW.

Your notes, plans and projects, together in a notebook you can make your own.

A familiar paper feel

Realistic scanned paper textures and book binding give you the feel of a Japanese notebook, with space for writing and drawing.

A place for every role

Give your subjects and tabs your own names. Keep home, study, work, clients and creative projects in one place.

Room to keep going

Copy a template into your chosen section whenever you need another page. Add only the layouts you use.

SEE HOW YOUR NOTEBOOK CAN TAKE SHAPE

One example. Your own sections, your own system.

Start with the parts of your life you want to organize.

The original example shows how one index can bring together yearly reviews, study notes, habit trackers, projects, recipes and journals.

  1. Name your side sections. Write titles beside the numbers in the index.
  2. Choose your pages. Duplicate a basic paper or essential template into a section.
  3. Keep it together. Use the notes page and the side rail to return to your subjects.

This filled-in index is an example of use. Your notebook gives you blank spaces to write your own titles.

See how the links work

FULLY HYPERLINKED INDEX PAGE

Organize your notes into different sections and subjects for easy navigation and referencing.

Swipe to follow the pages · Select a preview to enlarge

Clickable side sections

Write a title beside each of the 12 numbers in the index. Tap a row to open that side section. The numbered rail along the right edge opens the same sections.

Clickable notes page

Your notes page lists all 40 subjects. Tap a number to open that linked subject page, and tap the home icon to come back. Select any preview here to enlarge it.

12 SIDE TABS, YOUR OWN SECTIONS

Name your sections · Tap to open · Make room for every role

Swipe to follow the pages · Select a preview to enlarge

Select a section in the index or its matching numbered tab in the side rail. Use these tabs for journaling, keeping track of your gratitude, taking notes, creating mind maps, and brainstorming ideas.

40 LINKED SUBJECTS

Tap a number on your notes page to open its subject page.

Swipe to follow the pages · Select a preview to enlarge

Every subject page keeps the same navigation: the home icon returns to the index, the square icon opens the template index, and the side rail opens any of the 12 sections.

YOUR NOTEBOOK, EASY TO NAVIGATE

Index · Template index · 12 side sections

ALL THE ESSENTIAL TEMPLATES

Easy access to all essential papers & templates. All hyperlinked.

Swipe to follow the pages · Select a preview to enlarge

Copy first. Make it yours.

Use this template index page to navigate to the desired page. Copy or duplicate the page, then paste it after your target page. Remember to always copy/duplicate the template first before writing; do not write directly on the template page!

Turn on read-only or navigation mode in your PDF app to follow the hyperlinks.

Basic templates (25)

Scroll to browse · Select a page to enlarge

  • Blank
  • Blank 1×2
  • Blank 2×2
  • Blank Left Margin
  • Dotted
  • Dotted 1×2
  • Dotted 2×2
  • Dotted Left Margin
  • Lines
  • Lines 1×2
  • Lines 2×2
  • Lines Left Margin
  • Grid
  • Grid 1×2
  • Grid 2×2
  • Grid Left Margin
  • Cornell Blank
  • Cornell Lines
  • Cornell Grid
  • Cornell Dotted
  • Todo 1×2
  • Todo 2×2
  • Todo 3×2
  • Grid 2×1
  • Music Sheet

Essential templates (24)

Scroll to browse · Select a page to enlarge

  • Yearly Spread
  • Yearly Grid
  • Yearly · Day Month Tracker
  • Monthly · Day Tracker
  • Monthly Grid · Monday
  • Monthly Grid · Sunday
  • Monthly Spread
  • Weekly Vertical · Monday
  • Weekly Vertical · Sunday
  • Routines · Monday
  • Routines · Sunday
  • 30 Day Challenges
  • 100 Day Challenges
  • Vision Board
  • 100 Things
  • Multipurpose Table
  • Level 10 Life
  • 31 Things
  • Daily Page
  • Daily Page · Type 1
  • Daily Page · Type 2
  • Gantt Chart · Universal
  • Gantt Chart · Weekly Monday
  • Gantt Chart · Weekly Sunday

EVERYTHING IN YOUR GARDEN DOWNLOAD

Five paper formats, plus instructions and extras to help you get started.

Your notebook files

  • 5 PDF notebooksGrid, Lines, Blank, Dotted and Cornell. 107 pages in each file.
  • Linked organization40 subjects, 12 side sections, an index and a template index.
  • Reusable template library25 basic + 24 essential template pages, including Monday/Sunday variants.
  • Cover pageThe Garden artwork cover inside the notebook.

Help and bonuses included

  • Download instructions & tutorialsA PDF guide to help you get started.
  • Bonus covers & stickersFree covers and stickers after purchase, to personalize your pages.
  • Fully hyperlinked navigationHome icon, template index icon and the 12 side sections on every page.
  • Paper and no-texture optionsAvailable on paper texture, with a no-texture version for light editions.

Choose the paper format you prefer. All five formats are included with Garden; you do not need to buy each format separately.

FIVE PAPER FORMATS

Grid · Lines · Dotted · Blank · Cornell

Perfect for notetaking, studying, journaling, sketching, planning and many more!

FLEXIBLE & ADAPTABLE FOR ALL NEEDS

With 12 side tabs and 40 subjects, the options are limitless!

  • Journaling
  • Rapid logging
  • Brain dump
  • Meal planning
  • Music writing
  • Bullet Journaling
  • Note-taking
  • Brainstorming
  • Life Planner
  • Work Notebook
  • Study Notebook
  • Teaching Notebook
  • Novel Writing
  • Bible Study
  • ADHD Planner
  • Homeschooling
  • Home Management
  • Recipe Book
  • Travel Planner
  • Projects Planner

And many many more!

WHICH YUME NOTO IS RIGHT FOR YOU?

Choose the amount of structure that suits how you organize your notes.

V1

A simple starting point

12 side tabs and 40 subjects in Portrait. Start with your own titles and add pages as you need them.

A beginner-friendly choice. You are viewing V1 Portrait.

V2

More detailed organization

12 side tabs, each with 14 subsections. 168 sections in total for a deeper structure.

For people who want to divide their notebook into more areas.

V3

A middle level of structure

12 side tabs, each with 5 subsections. 60 sections in total.

For people who want more built-in organization than V1.

See the full notebook comparison

Landscape or Portrait?

Landscape gives you a wider canvas for study notes, planning and split layouts. Portrait gives you a vertical page for handwriting, reading and journaling, with 40 subjects and 12 side tabs.

Explore V1 Landscape

ALSO COMES IN LANDSCAPE

The same hyperlinked notebook, with a wider page.

Landscape gives you a wider canvas for study notes, split layouts and side-by-side planning. It keeps the same side tabs, indexes, reusable templates and realistic paper texture as this Portrait notebook, with 50 subjects and 12 side tabs.

  • 12 side tabs
  • 50 subjects
  • 143 pages per PDF
  • 58 template pages
  • Grid, lines, blank, dotted and Cornell PDF files
Yume Noto V1 Landscape Garden notebook cover with elastic strap

A FEW THINGS BEFORE YOU START

Choose the right setup for your notebook.

Is this a physical notebook or an app?

This is a digital PDF download. No physical item is shipped. Use it inside a compatible PDF annotation app on your tablet or computer.

Can I use it on my phone, print it, or use an e-reader?

This color edition is designed for tablets and computers. It is not designed for phone use or printing. If you use an e-reader, choose an e-reader edition with pages made for e-ink screens.

How do I download and start?

Your files are available after payment is confirmed. Follow the included download instructions and tutorials, then import your chosen paper format into your app. Open the download guide.

Why aren’t the links opening?

Switch your app to read-only or navigation mode. Some Android apps use a long press to follow links. Find device and app help.

Can I keep adding pages?

Yes. Copy or duplicate the template first, then paste it after your chosen linked page. Keep the original template clear so you can use it again.

Can I share or resell the files?

The notebook is for your personal use. Do not share, redistribute or resell the files.

CHOOSE YOUR PORTRAIT EDITION

Yume Noto V1 Portrait · Garden Edition

Use code 50OFFWEB for 50% off at checkout on NozomuNoto.com.

Prefer a wider page? Explore Yume Noto V1 Landscape.

Page preview

Select Zoom in for details. Scroll to explore. Press Escape to close.